|
Reports |
Date |
| Site maintenance programme (PDF 2.5MB) |
Feb 2008 |
| Pedestrian phases and upgrading crossings (PDF 21KB) |
Feb 2008 |
| Signalised junctions in London without pedestrian crossings (PDF 2.5MB) |
Feb 2008 |
| Signals without pedestrian phases (PDF 33KB) |
Feb 2008 |
| Sites not operating tts6 timings (PDF 38KB) |
Feb 2008 |
| Highway Asset Management Plan (HAMP) (PDF 2.79MB) |
Sep 2007 |
| Traffic Note 1 Traffic levels on major roads in Greater London 1993 - 2005 (PDF 6.42MB) |
Mar 2007 |
| Traffic Note 3 TfL Cordon and Screenline Surveys (PDF 2.2MB) |
Mar 2007 |
| CSS Summary Report 2006 (PDF 265K) |
Apr 2006 |
| Technical Note 3 - Total vehicle delay in London (PDF 1.39MB) |
Apr 2006 |
| Technical Note 2 - Traffic delays in London (PDF 6MB) |
Jul 2005 |
| Technical Note 1 - ITIS Speed Survey Data (PDF 3.7MB) |
Jul 2005 |
| ITIS Validation paper (PDF 1.5MB) |
Jul 2005 |
| Update of London Parking Supply Study Report (PDF 1.6MB) |
Jul 2005 |